Summary
● #210: Lupine Lake ○ Days on trail: 2 ■ Drains ■ Clearing ● #171: Ingalls Mtn ○ Days on trail: 2 ■ Drains ■ Brushing Details ● #210: Lupine Lake: 3.9 of 3.9 miles of trail maintained. ○ Installed and cleaned drains along entire length of trail. ○ Identified a bridge project: ■ Puncheon over muddy section (15 ft) at mile 0.7 from trailhead. ■ Talked with Derrick about acquiring wood for project. ○ Removed hazard leaners. ● #171: Ingalls Mtn: 2.2 of 8.1 miles of trail maintained. ○ Installed drains along 2.2 miles from upper N trailhead. Did not put eyes on lower section between FSR 538 and Star Meadows Guard Station. ○ Brushed a total of 0.3 miles with loppers. Most brush is small trees and Ceanothus (Snowbrush) in burn area starting about 1.5 miles up from TH.