Summary
● #800: Bill Cr ○ Days on trail: 1 ■ Treadwork ● #287: Pine Grass ○ Days on trail: 2 ■ Treadwork Details ● #800: Bill Cr: 0.2 of 4.9 miles of trail maintained. ○ Worked with FS and YCC Crews. ○ Started near the lower bridge and worked our way up. ○ Total tread work by FAMB: 300 ft. ● #287: Pine Grass: 0.4 of 4.3 miles of trail maintained. ○ Worked with FS Crews. ○ Started from the top of the ridge, installed drains and widened tread at new drain locations. ○ We will return in the next couple weeks to continue work, we have a couple other projects in progress to address. ○ Total tread work by FAMB: ~500 ft.