Summary
● #61: Hall Lake ○ Days on trail: 4 ■ Brushing Details ● #61: Hall Lake: 1.8 of 4.7 miles of trail maintained. ○ Total brushing: 1.8 miles. ○ Projects to address: ■ Clearing of drains. Recent heavy rains clogged 90% of them. ■ Lots of water/mud on trail above river crossing. Culverts have been installed in the past, but maintenance needs to be done. ■ Would like to talk about installing a bridge over the river crossing about a mile from TH. Currently no safe, dry way to cross.
0 Comments
Leave a Reply. |
About UsFlathead Area Mountain Bikers, a 501(c)(3) nonprofit, is working to promote mountain biking and improve trail access in the Flathead Valley. Archives
August 2024
Categories |