Summary
● #76: Beardance ○ Days on trail: 3 ○ Treadwork/drains ○ Clearing Details ● #76: Beardance: 1.5 of 6.5 miles of trail maintained. ○ Heavily addressed drainage issues along lower half of switchback section. Added rock armoring and created rock culverts. ○ Removed stump/rock near highway. It was causing problems for bikers and was considered a hazard. It was also a big step for hikers, with slippery roots/rocks nearby. Flush cut and raised tread to match/ensure drainage. ○ Replaced 60 feet of tread where roots had lead to trail creeping downhill. Added rock culvert and catch log to keep trail to spec width. ○ Removed 1 obstructing tree, cut back 6 other trees.